    I just received this from USACE.

    NEWS RELEASE
    For Immediate Release: NR 23-014
    March 13, 2023

    Contact: Clay Church, 817-886-1314 clayton.a.church@usace.army.mil

    Construction schedule update at Canyon Lake

    CANYON LAKE, Texas — The U.S. Army Corps of Engineers at Canyon Lake has rescheduled gate replacement work that was planned for this year.

    The gates are functioning as designed and priority in sequence of repairs has changed. Work on the control tower service bridge will precede gate replacement work. As a result of this change, USACE does not anticipate disruptions to river flow releases that would have resulted from the gate replacement work. USACE intends to change over low flow releases to the Guadalupe Blanco River Authority later this week.

    “Inspections and major repair work are needed to ensure that Canyon Dam and its associated water control infrastructure are properly maintained and function as designed to meet mission requirements and manage downstream risks that ultimately protect life safety and property” said Canyon Lake Manager, Javier Pérez Ortiz.

    Canyon Lake staff members encourage all visitors to practice leave-no-trace, use designated trash receptacles and always wear a life jacket while boating or anytime in or near the water.

    For additional information contact the Canyon Lake Office at 830-964-3341 Monday-Friday, 8 a.m. to 4:30 p.m.
    -30-

    Visit the Fort Worth District Web site at: http://www.swf.usace.army.mil and social media at: https://about.me/usacefortworth

    U.S. ARMY CORPS OF ENGINEERS – FORT WORTH DISTRICT
    819 TAYLOR STREET
    FORT WORTH, TX 76102
    http://WWW.SWF.USACE.ARMY.MIL

    December 18, 2022 at 11:56 am #15670

    You are both welcome and a Merry Christmas to you and yours.

    To Anyone – Email Dan if you have the ability to assist in getting the final 3 installed.

    December 15, 2022 at 8:26 pm #15664

    Ron – individual links have been placed for each monitor that gives full information including graphs.

    • This reply was modified 1 year, 10 months ago by satmarshall.
    December 15, 2022 at 10:11 am #15661

    Scott – no. There are a total of 7. Dan still has some work to be done to get the other 3 up and running. The 4 on grtu.org are working just fine and have more than enough data points for folks to make wise fishing decisions. We will get the other 3 in, but for an ETA, get with Dan at coned@grtu.org.

    November 18, 2022 at 2:08 pm #15559

    These are only announced to LAP Members in advance

    November 12, 2022 at 7:14 am #15515

    11 am at Rio Raft. It’s on GRTU.org and our FB events page with the times and agenda.